SR 400 (I-4) Valencia Water Control District Daryl Carter Parkway

Smith Site South’s responsibilities consist of installing underground utilities, stormwater drainage, and widening a section of I-4. Pipe sizes range from 18″ to 5 1/2 feet, consisting of polypropylene, concrete, & steel pipe.

Scope of Work:

  • FDOT Stormwater Drainage
  • Installing 6.27 miles of storm sewer pipe
  • 280 storm structures
  • 31 Mitered End Sections

Reach Out To Our
Expert Team!

Address: 526 Cooper Industrial Parkway Apopka, FL 32703

Fax: 352-609-5927

team-image