Smith Site Development South was selected for the civil site work at this challenging site for a luxury apartment community. The entire site required extensive dewatering, clearing, grubbing and muck removal. Beautiful 3 Acre Pond and miles of Sidewalk.
Scope of Work:
- Install Erosion Control Measures
- Clear & Grub 23 Acre Site
- Extensive Dewatering entire Site
- Install Construction Entrances
- 219,000 CY Infill Material
- 13,625 Ton Lime rock Imported
- Installed 5,480 LF Storm Water & 24′ Depth Lift Station
- 3,570 LF Sanitary Sewer with 16 Structures
- 5,680 LF Storm Pipe Installed
- 3,840 LF Fire Line Installed
- Installed 3,400 LF Domestic Water
- 10,000 CY Clay Imported
- 29,771 SY base Asphalt
- 3 Acre Retention Pond
- 64,000 SF Concrete Sidewalk
- 2.6 Miles of Concrete Curbing