FDOT Stormwater Drainage, installing 6.27 miles of storm sewer pipe, 280 storm structures, & 31 Mitered End Sections.

Earth work, Mass Grading and Fine Grading, Stormwater Drainage, Storm Water, Sanitary, Force Main Water, Fire Line Installation, Testing Utilities, Wear Lift Asphalt, Crushed Limestone base placement, Concrete Ramps and Sidewalks, Concrete curbs, Heavy and Light Duty Asphalt, Stripping and Site Signage

Demolition of Existing Structures, Reclaim, Storm Drainage, Water Main, Sanitary Sewer, Force Main, Fire Lines, Master Meter Assembly, Life Station (Wet Well), & Roof/Yard Drains.

30 inch sanitary sewer, & Upgrading sewage treatment plant.